 |
60-metre long facility
|
Model trains built to scales of between 1:100 and 1:20 can be accelerated up to speeds of 400 kilometres per hour in the tunnel simulation facility at Göttingen, which measures more than 60 metres in length.
|
|
|
 |
 |
URL for this article http://www.dlr.de/en/desktopdefault.aspx/tabid-6216/10226_read-26953/gallery-1/gallery_read-Image.1.17106/ |
Related Links
http://www.dlr.de/en/desktopdefault.aspx/tabid-1/86_read-26701/ |
http://www.dlr.de/as/en/desktopdefault.aspx |
Related Downloads
|
DLR Video: Tunnel simulation facility in Göttingen (MPEG-4, low-res, 1:12 Min.) (http://www.dlr.de/en/Portaldata/1/Resources/portal_news/newsarchiv2010_6/Tunnelsimulation_320x240.mp4) |
|
DLR Video: Tunnel simulation facility in Göttingen (MPEG-4, high-res, 1:12 Min.) (http://www.dlr.de/en/Portaldata/1/Resources/portal_news/newsarchiv2010_6/Tunnelsimulation_578x326.mp4) |
|
|
 |