Project structure of DISTOR
DISTOR has been started in February 2004 and will last until September 2007. The project can be separated into three different phases:
- Basics:
characterization of the storage materials, identification of the requirements defined by the power plant, physcial models describing the transient behaviour of the storage system
- Lab scale experiments for all three concepts:
Test units with a thermal power of 10kW are developed for all three basic concepts. The experimental results are used for the validation of the physical models.
- On sun experiments at the solar test center at Almeria:
One of the basic concept is selcted for further experiments with a 100kW test unit. This test unit is connected to solar collectors to investigate the operation with solar boundary conditions.
|
|
 |
 |
URL dieses Artikels http://www.dlr.de/tt/desktopdefault.aspx/tabid-2872/4415_read-6485/ |
Texte zu diesem Artikel
Project DISTOR (http://www.dlr.de/tt/desktopdefault.aspx/tabid-2872/4415_read-6488/usetemplate-print/) |
Latent Heat Storage Systems (http://www.dlr.de/tt/desktopdefault.aspx/tabid-2872/4415_read-6487/usetemplate-print/) |
Consortium (http://www.dlr.de/tt/desktopdefault.aspx/tabid-2872/4415_read-6484/usetemplate-print/) |
|