OPTIC is a research project under EU’s 7th framework program. It is meant to develop measures that help to identify and evaluate possible adverse effects, which may result from the introduction of transport policy measures, in advance. Furthermore, this project will develop recommendations for optimal combinations of transport policy measures as a part of sets of measures that will minimize adverse effects and provide positive synergies.
It is assumed that sets of measures involve possible synergies. Therefore they are assessed as more effective than isolated measures. A simple example of adverse side effects is the reduction of vehicles fuel consumption due to technological progress. The positive effect of producing less emissions is cancelled out by more vehicle use as a result of reduced petrol costs. If this counteracts the environmental goals of transport policy like in this example, additional measures are necessary to compensate the cost advantage of personal car-use in comparison to other transport vehicles.
Objectives
The overall objective of OPTIC is to summarize and to extend the knowledge about an optimal design of transport policy measure sets. This includes evaluating the suitability of quantitative (e.g. transport models) and qualitative (e.g. stakeholder interviews) valuation methods. The practical relevance of the project is reflected in the integration of social actors. Decision makers and experts involved in planning practice, will discuss and test the developed methodology in workshops throughout the project.
Approach
In summary the OPTIC project,
The DLR Institute of Transport Research is partner in OPTIC and primarily engaged with the evaluation of quantitative methods for policy (package) assessment. A main emphasis is on analyzing and evaluating when and where along the policy-making process the application of quantitative methods is recommended. The focus is on European transport and emission models TransTools and Tremove, which are mainly used for the evaluation of European projects.
Client
Partners
Project duration
from 09/2009 to 08/2011