150 m measuring mast in front of OPUS 1
150 m measuring mast in front of OPUS 1
IECplus measuring mast for capturing meteorological influences at the DLR Research Wind Farm WiValdi. In the background, the two wind turbines OPUS 1 and OPUS 2 (Enercon E115 EP3 4.26 MW) can be seen.
