The simulation model has been produced based on real load data

The simulation model has been produced based on real load data
The simulation model has been produced based on real load data
At the DLR Institute of Networked Energy Systems, the team around HyReK Project Manager Theys Diekmann (right) has produced a simulation model which optimises operation of the Stadtwerke Bremen hybrid regulating power plant on a laboratory scale.