PV system at DLR's Weilheim site
PV system at DLR's Weilheim site
A roof system with a peak output of 37 kilowatts was commissioned in Weilheim in 2024. Two additional ground-mounted systems have since been built, which are due to be connected to the network in 2025. It is expected that approximately 400,000 kilowatt hours of electricity will be generated annually, fully covering the site's needs.
Credit: DLR (CC BY-NC-ND 3.0)
