OPUS 2 construction site with OPUS 1 and measuring mast array in the background

OPUS 2 construction site with OPUS 1 and measuring mast array in the background
OPUS 2 construction site with OPUS 1 and measuring mast array in the background
In April and May, the construction site team assembled the second wind turbine OPUS 2.