Preparing the rotor blades for installation on the rotor hub
Preparing the rotor blades for installation on the rotor hub
A crane lifted OPUS 3's rotor blades – each 25 metres long and weighing 2.5 tonnes – into position so they could be attached to the turbine's rotor hub while still on the ground.
Credit: © DLR. All rights reserved
